This is the top of the page.
Displaying present location in the site.
  1. Home
  2. Products
  3. Submarine Systems
  4. About NEC's Submarine Systems
  5. Supply Record
Main content starts here.

Supply Record

Newly Built Systems since 2001

Project System Length Total/Partial In Service
APCN2 19,000 km Total 2001
AJC 12,000 km Total 2001
EAC2 7,800 km Total 2002
Algiers-Palma Cable 310 km Partial 2002
HMC 280 km Total 2002
TIS 1,100 km Total 2003
AUFS-West 2,500 km Total 2004
DMCS 150 km Total 2004
JASUKA 1,800 km Total 2006
BLCS 320 km Total 2006
EAC1 Qingdao Extension 350 km Total 2006
DSCN 1,100 km Total 2007
Russia-Japan Cable Network 1,800 km Total 2008
Trans-Pacific Express 17,200 km Partial 2008
Hokkaido Sakhalin Cable System 560 km Total 2007
Batam Singapore Cable System (BSCS) 98 km Total 2009
Jakabare 1,400 km Total 2009
Asia America Gateway 20,000 km Partial 2009
Unity 9,500 km Partial 2010
I-ME-WE 12,000 km Partial 2011
Dhiraagu Domestic Submarine Cable (DDSCN) 1,000 km Total 2012
Asia Submarine-cable Express (ASE) 7,200 km Partial 2013
South-East Asia Japan Cable System (SJC) 8,900 km Partial 2013
Sulawesi Maluku Papua Cable System (SMPCS) Packet-2 3,500 km Total 2015
FASTER Cable System 11,500 km Total 2016
Asia Pacific Gateway (APG) 10,400 km Total Ongoing
TPKM3 500 km Total Ongoing
SEA-ME-WE 5 Cable System (SMW5) 20,000 km Partial Ongoing
SOUTHEAST ASIA UNITED STATES Cable System (SEA-US) 14,500 km Total Ongoing
Asia Africa Europe 1 (AAE-1) S-1H Hong Kong Extension 2,900 km Total Ongoing
South Atlantic Cable System (SACS) 6,200 km Total Ongoing
System Kabel Rakyat 1 Malaysia (SKR1M) 3,700 km Total Ongoing
ATISA 279 km Total Ongoing
Indonesia Global Gateway (IGG) 5,300 km Total Ongoing

Newly Built Ocean Bottom Sensor Systems

Project System Total/Partial In Service
DONET II (JAMSTEC) Node System Total Ongoing
Japan Trench OBSS (NIED) In-line System Total Ongoing
Eastern Taiwan OBSS (CWB, Taiwan) Node System Total 2011
DONET (JAMSTEC) Node System Total 2010
Omaezaki OBSS (JMA) In-line System Total 2008
       
(Before 2001)      
Kushiro OBSS (JAMSTEC) In-line System Total 1999
Muroto OBSS (JAMSTEC) In-line System Total 1997
Hiratsuka OBSS (NIED) In-line System Total 1996
Kamaishi OBSS (NIED) In-line System Total 1996
Ito OBSS (ERI-University of Tokyo) In-line System Total 1993
Katsuura OBSS (JMA) In-line System Total 1986
Omaezaki OBSS (JMA) In-line System Total 1979

Capacity Upgrades since 2001

Project In Service   Project In Service   Project In Service
APCN2 Upgrade 2001   JASUKA 2008 Upgrade 2009   DMCS Upgrade 2013
FEA Upgrade 2003   SUB 2008 Upgrade 2009   AUFS Upgrade 2013
JIH Upgrade 2004   MDSCS Upgrade 2009   HMC Upgrade 2013
HMC Upgrade 2004   AUFS Upgrade 2009   JIH Upgrade 2013
JIH Upgrade 2005   JIH Upgrade 2009   APCN2 Stage 2e Upgrade 2013
AUFS-East Upgrade 2005   PamAm Upgrade#1 2010   JSSC#1 2013
MDSCS Upgrade 2005   AUFS Upgrade 2010   JAKABARE Upgrade#1 2013
HMC Upgrade 2005   JASUKA 2009 Upgrade (PO#1) 2010   JASUKA 2012 Upgrade (PO#1) 2013
TJP-PTK Upgrade 2006   JASUKA 2009 Upgrade (PO#3) 2010   EAC Pacific 2nd Upgrade 2013 2013
EAC1 Qingdao Upgrade 2006   JASUKA 2009 Upgrade (PO#5) 2010   APCN2 Stage 2f Upgrade 2014
Maya-1 Upgrade#2 2006   AJC 30G Upgrade 2010   SJC Upgrade#1 2014
EAC2 Upgrade 2006   JIH Upgrade 2010   AUFS-East/West Upgrade 2014
APCN2 Upgrade 2006   HMC Upgrade 2010   JASUKA 2012 Upgrade (PO#2) 2014
JIH Upgrade 2006   EAC1 & EAC2 Upgrade 2011   SUB Upgrade (PO#1 and PO#2) 2014
APCN2 Upgrade 2007   APCN2 Stage1e/2b Upgrade 2011   JASUKA 2012 Upgrade (PO#3 and PO#4) 2014
JASUKA 2007 Upgrade 2007   MOC Upgrade 2011   JASUKA 2012 Upgrade (PO#5) 2014
SUB Upgrade 2007   APCN2 Stage 2c Upgrade 2011   APCN2 Stage 2g Upgrade 2014
JIH Upgrade 2007   JIH Upgrade 2011   SUB Upgrade (PO#3) 2015
HMC Upgrade 2007   EAC PACIFIC Upgrade 2011   PanAm Upgrade#2 2015
APCN2 Upgrade 2008   JASUKA 2009 Upgrade (PO#7) 2011   AUFS East and West 100Gbps Upgrade 2015
AJC Upgrade 2008   JIH Upgrade 2012   APCN2 Stage 2h Upgrade 2015
Azores Upgrade 2008   MOC Upgrade 2012   SUB Upgrade (PO#4) 2016
Maya-1 Upgrade#3 2008   APCN2 Stage 1g/2d Upgrade 2012   JSSC#2 Ongoing
AUFS-East Upgrade 2008   AUFS Upgrade 2012   JAKABARE Upgrade#2 Ongoing
AUFS-West Upgrade 2008   HMC Upgrade 2012  
JIH Upgrade 2008   Russia Japan Cable Network Upgrade 2012  

Top of this page